+91 98192 66229 simplexmumbai01@gmail.com Mon – Sat : 10:00 AM – 7:00 PM
HomeInstallation Tips

Installation Tips

Flooring installation guidelines – acclimatisation, sub-floor preparation, underlay and finishing. Simplex Interior Solutions®, Mumbai.

Installation guidelines

For best results, we recommend installation by the trained Simplex team. Here is an overview of the process:

  1. Acclimatise: Keep the boxes in the room for 24–48 hours before installation.
  2. Prepare the sub-floor: Ensure it is clean, dry and level (max 2 mm variation over 1 m).
  3. Underlay: Lay a moisture barrier and underlay for laminate and engineered floors.
  4. Expansion gap: Leave 8–10 mm gap around walls and fixed objects.
  5. Lay the boards: Start from the longest straight wall and stagger joints by at least 30 cm.
  6. Finish: Fix skirting, T-profiles and end profiles to cover expansion gaps.

Carpet tiles

Start from the centre of the room, use a tackifier adhesive and follow the arrow direction on the backing for the chosen pattern (monolithic, quarter turn, brick or ashlar).

Planning a new space? Let’s design it together.

Free consultation, site measurement and expert product guidance.

Book Consultation Call Now